Tacoma development report: December 2024
In December 2024, 65 new projects were filed in Tacoma, including 14 new homes, 11 apartment or townhome projects, 2 commercial, 29 land-use applications and 7 demolitions (290 housing units). That's up 18% from the month before and up 550% from a year earlier.
What was filed
Last 12 months
All new filingsNew homes, townhomes & apartments
Notable new projects 60 of 65
Addresses, estimated values and unit counts are shown to members. Sign up free
- Construct New 7-Story Apartment Building Containing 5 Stories Of Type V-A Over 2 Stories Of Type I-A; Proposing One-Hund Apartments & townhomes · Dec 20, 2024 In review
- Construct 5 Story, 80 Unit, (92, 818 SF), Va Construction Mixed Use Apartment Building With One Stroy Commercial Wings Apartments & townhomes · Dec 6, 2024 Approved
- Construct A 3-Story, 30 Unit, Mixed Use Apartment Building With 3 Small Commercial Spaces, VB Construction. Building # Apartments & townhomes · Dec 13, 2024 · Synthesis9 LLC In review
- Construct A 3-Story, 24 Unit, Apartment Building, VB Construction. Building #2. Apartments & townhomes · Dec 13, 2024 · Synthesis9 LLC In review
- Construct A 12-Unit, 9, 725 SF, 3-Story, Sprinklered, VB Construction Apartment Building. Apartments & townhomes · Dec 31, 2024 · Synthesis9 LLC Approved
- The Full Project Scope Includes Construction Of (3) New Residential Buildings For A Total Of (12) New Residences On A La Apartments & townhomes · Dec 20, 2024 Cancelled
- CONSTRUCT (4) 3-STORY, 7962 SF (per drawings) VA -CONSTRUCTION, TOWNHOMES. EACH NEW TOWNHOME TO CONSIST OF (3) BEDROOMS, Apartments & townhomes · Dec 31, 2024 Status unknown
- CONSTRUCT (4) 3-STORY, 7962 SF (per drawings) VA -CONSTRUCTION, TOWNHOMES. EACH NEW TOWNHOME TO CONSIST OF (3) BEDROOMS, Apartments & townhomes · Dec 31, 2024 Approved
- Construct a new three-story four-unit 7551SF townhome building. Each townhome is 3BD/3.5BA with an attached garage. **S Apartments & townhomes · Dec 31, 2024 Approved
- The Full Project Scope Includes Construction Of (3) New Residential Buildings For A Total Of (12) New Residences On A La Apartments & townhomes · Dec 20, 2024 Cancelled
- The Full Project Scope Includes Construction Of (3) New Residential Buildings For A Total Of (12) New Residences On A La Apartments & townhomes · Dec 20, 2024 Cancelled
- Early (phase 1) foundation and site retaining wall permit for new TPS Lowell Elementary School. Grading design has been Commercial · Dec 16, 2024 Completed
- Construct 582 square foot pre-fabricated storage building. Commercial · Dec 9, 2024 In review
- Height Variance application for a site w/thin the View Sensitive District for a dormer addition to an existing single fa Land use · Dec 31, 2024 Completed
- FOR CHECK PROCESSING ONLY - Special Tax Valuation Land use · Dec 30, 2024 Completed
- SEPA MDNS application for a mixed-use development including 51-units and 1,680 square feet of retail uses, with a total Land use · Dec 30, 2024 Completed
- Requesting a Land Use Coaching Meeting Land use · Dec 28, 2024 Cancelled
- Segregate Lots 27-29 at 2523 58th Ave NE Tacoma Land use · Dec 27, 2024 Cancelled
- Vacant land; No structures on site... Platted lots 14 and 15 are 25' respective widths. This is a simple segregation of Land use · Dec 23, 2024 Completed
- Request To Combine 5 Parcels Into 1 For New Proposed 7 Story Apartment Building. The New Parcel Number Is 2021170091.The Land use · Dec 23, 2024 Completed
- Variance application to reduce the required off-street parking quantity requirement from 36 to 23 parking stalls for a 1 Land use · Dec 20, 2024 Completed
- 6414 N Park Way ZVL Land use · Dec 19, 2024 Completed
- Prelim Short Plat Into 2 Lots For Future Construction Of A 3-Unit Residential Building; The Existing Duplex Will Remain. Land use · Dec 18, 2024 Completed
- 24-Lot Preliminary Plat, SEPA Environmental Review and Critical Areas Minor Development Permit applications for resident Land use · Dec 18, 2024 Completed
- A Major Modification to an existing Critical Areas Development Permit under File No. LU20-0238 to add (2) Wapato Creek b Land use · Dec 17, 2024 Completed
- Complete lot combination of the properties located at 1701, 1703 and 1705 S L St, Tacoma, WA. Parcel no: 2017230011, 201 Land use · Dec 16, 2024 Completed
- 3102, 3120 S Pine ST ZVL Land use · Dec 11, 2024 Completed
- Preliminary Short Plat to subdivide lot into two lots. New lot one existing residence to remain. New lot two will constr Land use · Dec 11, 2024 Completed
- Zoning verification for address. These addresses are accessible from Commerce street and formerly the Johnson Cox printi Land use · Dec 10, 2024 Cancelled
- A Boundary Line Adjustment to reconfigure two lots on the City's golf range site. Land use · Dec 9, 2024 Completed
- lkjllkj Land use · Dec 6, 2024 Cancelled
- Final Plat application in reference to Preliminary Plat – LU19-0230 and Work Order – WO21-0061. Land use · Dec 6, 2024 Completed
- A Final Short Plat to subdivide 2807 61st Avenue Northeast into two parcels that will be used for single-family resident Land use · Dec 6, 2024 Cancelled
- Test LU Records Land use · Dec 5, 2024 Cancelled
- Settlement of concrete sidewalk pavement near the shoreline bulkhead and within the direct pedestrian thoroughfare of An Land use · Dec 5, 2024 Completed
- Monitoring for marine buffer access through restoration area- Minor Amendment to Shoreline Substantial Development Permi Land use · Dec 4, 2024 In review
- James Center ZVL Land use · Dec 3, 2024 Completed
- 618 N 1st ST ZVL Land use · Dec 3, 2024 Completed
- A setback variance to allow the existing garage to be updated with an addition of a 434 square foot detached accessory d Land use · Dec 3, 2024 Completed
- APPEAL REQUESTED 5/14. LU SIGN VARIANCE DECISION DENIED: A level two sign variance to replace an aging manual letterboa Land use · Dec 2, 2024 Completed
- 2331 S 24th ST ZVL Land use · Dec 2, 2024 Completed
- 2353 Tacoma Ave S ZVL Land use · Dec 2, 2024 Completed
- Construct 2 story, 2506 sqft SFD. Plumbing and mechanical included. New homes · Dec 24, 2024 Cancelled
- Construct 2 story 2506, sqft SFD. Plumbing and Mechanical included. New homes · Dec 24, 2024 Cancelled
- Constructing new 1-story 1198SF 2BD 2BA SFD with 61SF attached porch. Includes plumbing and mechanical per approved plan New homes · Dec 9, 2024 In review
- Construction of a new 948SF 2BD/2BA 2-story DADU with a 487SF attached garage. Includes plumbing and mechanical per appr New homes · Dec 9, 2024 · MKM Legacy LLC Completed
- Build New D-Adu In The Rear Of The Existing House = 1000 SF. With 2 Bedrooms, 2 Bathrooms, Kitchen New homes · Dec 21, 2024 Cancelled
- Proposed 1bedroom,1 bathroom DADU related to BLDRN25-0045 SFD. Mechanical and plumbing included per approved plans. ***F New homes · Dec 30, 2024 Approved
- Detached garage with living space above, at SFD. Includes plumbing and mechanical per approved plans. New homes · Dec 24, 2024 · SE Construction LLC Approved
- DADU- 192 sq Ft plumbing included 1 bathroom, 1 kitchen, 1 shower. New homes · Dec 18, 2024 Status unknown
- Demo existing home down to the foundation and rebuild new 4 bedroom 2 and half bathroom SFD. ***FRR25-0095 APPROVED 05-2 New homes · Dec 13, 2024 Completed
- Construct 29' x 24' detached garage in the rear SFD. New homes · Dec 17, 2024 Approved
- Constructing new 1-story 528SF detached storage garage at SFD. No plumbing or mechanical included. ***Separate DEMOR pe New homes · Dec 17, 2024 Approved
- Demolishing existing carport and building 288 SF detached garage on same footprint at SFD. No plumbing or mechanical inc New homes · Dec 24, 2024 Status unknown
- Construct 286 sqft detached garage west of the SFD. No mechanical or plumbing scope included New homes · Dec 16, 2024 Completed
- Building a 18’6x19’4 addition 1 bed 1 bath and walk in closet New homes · Dec 30, 2024 · Kings Finish LLC Cancelled
- The site consists of two parcels which will be combined for the construction of two apartment buildings and a parking lo Roads, transit & utilities · Dec 24, 2024 In review
- On-site and Offisite improvements associated with two parcels which will be combined for the construction of two apartme Roads, transit & utilities · Dec 24, 2024 In review
- Demolition of 1024SF SFD and a two-car detached garage. Demolition · Dec 6, 2024 Approved
- Demo existing SFD and attached gazebo structure. Demolition · Dec 11, 2024 Approved
Most active builders (12 months)
Reports by ZIP code
Counts are by application date (issue date when no application date is published) for new homes, apartments and townhomes, commercial buildings, demolitions, land-use applications and public works. Renovations and trade permits are not counted. Recent months can rise as cities post late records.
Thinking about buying or selling nearby?
Valyn follows new construction and land-use filings every day. Ask her what a project means for your home's value or your search.