Monthly report
Tacoma development report: February 2026
In February 2026, 49 new projects were filed in Tacoma, including 10 new homes, 12 apartment or townhome projects, 3 commercial, 19 land-use applications and 5 demolitions (40 housing units). That's down 20% from the month before and down 18% from a year earlier.
What was filed
Last 12 months
All new filingsNew homes, townhomes & apartments
Notable new projects
Addresses, estimated values and unit counts are shown to members. Sign up free
- Construct New Three-Story, 5500-SF Multi-Family Houseplex With Six Dwelling Units. Three Vehicle Parking Spaces And Seve Apartments & townhomes · Feb 3, 2026 Approved
- Construct two new DADUs behind the existing SFD. The DADUs share a common wall so they look like a duplex. Each unit is Apartments & townhomes · Feb 2, 2026 Completed
- Construct a 2-level duplex in the rear of the existing SFD. (Related SDEV26-0127) ** Plumbing and Mechanical included ** Apartments & townhomes · Feb 25, 2026 · Northend Construction Of Tacoma Approved
- Construction of stacked 790 sq ft duplexes over a 2-bay garage at SFD. Apartments & townhomes · Feb 16, 2026 Approved
- Construct a three-story building with two 2BD/1BA units over a two-car garage. Includes plumbing and mechanical per appr Apartments & townhomes · Feb 15, 2026 Approved
- Construct 2 bedroom, 2 bathroom Duplex Dadu in Rear of New SFD (BLDRA25-0058) ** Plumbing and Mechanical included ** Apartments & townhomes · Feb 24, 2026 Approved
- Construct 2 story 3-bedroom 2-bathroom Duplex DADU in rear of existing SFD. (Related SDEV26-0070) ** Plumbing and Mechan Apartments & townhomes · Feb 23, 2026 Approved
- Construction of two new detached accessory dwelling units (DADUs) on an existing single-family residential lot. related Apartments & townhomes · Feb 19, 2026 · Adapt Building Development LLC Approved
- Construction of a 2 level Studio duplex. Building B. Mechanical and Plumbing per approved plans. Apartments & townhomes · Feb 13, 2026 In review
- Construction of a 2-level Studio duplex. Building D. Mechanical and plumbing included per approved plans. Apartments & townhomes · Feb 13, 2026 In review
- construction of a 2-level Studio duplex. Building C. Mechanical and Plumbing per approved plans Apartments & townhomes · Feb 13, 2026 In review
- Construction of a 2-level Studio duplex. Building E. Mechanical and plumbing included per approved plans. Apartments & townhomes · Feb 13, 2026 In review
- Construct 57, 613 SF, Two Story, Iib Construction, New Water Operations Building For Tacoma Public Utilities - Water, In Commercial · Feb 26, 2026 Approved
- Installation of a temporary sales center located on Lot 8. The scope includes interior and exterior renovation of a L&I Commercial · Feb 19, 2026 · Toll Brothers Cancelled
- Replace old duckbill check valves with in-line check valves, install accompanying structures for new valves, install per Commercial · Feb 24, 2026 Cancelled
- To accommodate new stormwater generated from the proposed Morcos development upslope at 5801 Marine View Drive, and to e Land use · Feb 3, 2026 In review
- Critical Areas Development Permit to build a new trickling filter structure, mechanical equipment upgrades, and associat Land use · Feb 26, 2026 In review
- Combination of parcel: 2079410021 and 4715011721 into one parcel. NO LONGER ACTIVE 2079410021 has been split or merged. Land use · Feb 26, 2026 Completed
- 726 Pacific Ave ZVL Land use · Feb 26, 2026 Completed
- SEPA environmental checklist with geotech report for proposed outdoor graveled equipment storage yard. Land use · Feb 25, 2026 Completed
- Adjust the shared boundary line between 3578 and 3580. Recording Number 202608035001 Land use · Feb 24, 2026 Completed
- A Critical Areas Minor Development Permit and SEPA Review for grading work that impacted an Oregon White Oak habitat. R Land use · Feb 24, 2026 In review
- Complete a lot combination on these three abutting lots in order to finalize permits...see Larry Harala/Noah Yacker Land use · Feb 19, 2026 Completed
- 48-unit rental rowhouse community. Land use · Feb 17, 2026 Completed
- Lot Combination Land use · Feb 16, 2026 Completed
- Combine lots 6440005170 and 6440005152. PC completed on 3/4/2026; 2026-0365; 6440005153; 1665 S 47TH ST Land use · Feb 16, 2026 Completed
- Termination of Accommodation Agreement (For Special Needs Accommodation). CZA dated April 13, 2018. Summary: Carport req Land use · Feb 13, 2026 Completed
- City of Tacoma SEPA, TP as Lead Agency: Tacoma Power is replacing a 72-in. diameter culvert. The existing culvert was in Land use · Feb 12, 2026 Completed
- Planting required associated with LU24-0070 and LU24-0089 Land use · Feb 10, 2026 In review
- 1623 E J ST Zoning Verification Letter Land use · Feb 5, 2026 Completed
- Lot Segregation. Create new parcel and address for lot 4 Land use · Feb 4, 2026 Completed
- Boundary Lot Adjustment. Recording No. 202609215001 Land use · Feb 3, 2026 Completed
- 3320 Lincoln Ave Zoning Verification Letter Land use · Feb 3, 2026 Completed
- Conditional Use Permit for new sport fields and related improvements at the Peck Community Sports Park. Land use · Feb 3, 2026 In review
- Construct 3764 sqft 3 bedroom 3.5 bathroom SFD. (Related SDEV26-0156 for UTILITY CONNECTIONS and EROSION CONTROL, etc.) New homes · Feb 27, 2026 Approved
- Construct a new 3306 Sq. Ft. house 2 story, 4-bedrooms, 5-baths, with a detached garage SFD. (Related SDEV26-0044) ***PL New homes · Feb 3, 2026 Approved
- Construct 4 bedroom, 3 bathroom SFD. Includes mechanical and plumbing per approved plans. New homes · Feb 24, 2026 Approved
- Construct 2 story single family residence with 3 bedrooms and 3 bathrooms and attached garage. Includes mechanical and p New homes · Feb 10, 2026 · Milton Homes INC Completed
- Construction of a new detached accessory dwelling unit on an existing single-family residential lot. ** Plumbing and Mec New homes · Feb 23, 2026 · Adapt Building Development LLC Approved
- NEW DADU 1,000 SQFT ** plumbing/ mechanical included** New homes · Feb 15, 2026 In review
- Construct a two-story 1,000SF 3bed/2ba DADU. (Related SDEV26-0050) Includes plumbing and mechanical scopes per plans. New homes · Feb 5, 2026 Completed
- Construct DADU in rear yard of SFD. ** Plumbing and Mechanical Included ** New homes · Feb 19, 2026 Approved
- Construction of DADU in rear of existing SFD. ** Plumbing and Mechanical included ** New homes · Feb 6, 2026 · Meacham Development, LLC Approved
- Construction of a new garage at SFD. Separated from DADU BLDRN **No Plumbing and No Mechanical Included*** New homes · Feb 10, 2026 · Meacham Development, LLC Approved
- Demolish main House (separate permit for garage) LIC#EVERGDR757P8 Demolition · Feb 21, 2026 Approved
- DEMO of the garage to make way for the house addition on the back part of my house. at SFD Demolition · Feb 17, 2026 Completed
- Demolish of an existing non-historic rear deck attached to the SFD. Demolition · Feb 10, 2026 Cancelled
- Demolition of a 3,000 SF wash facility including slab and elevated concrete loading dock. Demolition · Feb 13, 2026 Completed
- Demolition of detached garage. Demolition · Feb 24, 2026 Approved
Most active builders (12 months)
Reports by ZIP code
Counts are by application date (issue date when no application date is published) for new homes, apartments and townhomes, commercial buildings, demolitions, land-use applications and public works. Renovations and trade permits are not counted. Recent months can rise as cities post late records.
Thinking about buying or selling nearby?
Valyn follows new construction and land-use filings every day. Ask her what a project means for your home's value or your search.